|
At the work up for the building of a wastewater
treatment plants in Ath an EOD-expert 'helps' the
safe progress of the digging work.
This happens in 3 fases:
-
Detecting the soil
-
Aproaching the detected objects and safely
remove the found ammunition
-
Assisting during digging work
I. Detecting the soil
This happens on the surface and/or in drillholes.
|
magnetic research: |
electromagnetic
research |
magnetic
research |
| Vallon 1303 |
EM61 MK2
|
Vallon 1303D |
The obtained detectiondate is processed and compared
through software
and projected on plan to define the exact position
of the detected objects.
II. Aproaching the detected objects and
safely remove the found ammunition

Dozens of WW1-projectiles of different calibres (7,6
cm > 25 cm) were digged out.
III. Assisting during digging work
During digging work there's a continue safety policy

|