|
During preparation works for the construction of a wastewater
treatment plants in Ath, an EOD-expert 'helps' the
safe progress of the digging work.
This happens in 3 fases:
-
Detecting the soil
-
Aproaching the detected objects and safe
removal of the detected ammunition
-
Assisting during excravations
I. Detecting the soil
This happens on the surface and/or in drillholes.
|
magnetic research: |
electromagnetic
research |
magnetic
research |
| Vallon 1303 |
EM61 MK2
|
Vallon 1303D |
The obtained detectiondate is processed and compared
through software
and projected on plan to define the exact position
of the detected objects.
II. Aproaching the detected objects and
safely removing the detected ammunition

Dozens of WW1-projectiles of different calibres (7,6
cm > 25 cm) were dug out.
III. Assisting during excavation
During the excavation there is a continuous safety
accompaniment

|