aDeDe's homepage
                                          
 
 

     Demining Works in Ath

 

At the work up for the building of a wastewater treatment plants in Ath an EOD-expert 'helps' the safe progress of the digging work.

This happens in 3 fases:

  1. Detecting the soil

  2. Aproaching the detected objects and safely remove the found ammunition

  3. Assisting during digging work

 

I. Detecting the soil

This happens on the surface and/or in drillholes.

                  

                         magnetic research:                         electromagnetic research                         magnetic research
Vallon 1303 EM61 MK2 Vallon 1303D

    

The obtained detectiondate is processed and compared through software

and projected on plan to define the exact position of the detected objects.

      

 

II. Aproaching the detected objects and safely remove the found ammunition

        

          

       

Dozens of WW1-projectiles of different calibres (7,6 cm > 25 cm) were digged out.

    

 

III. Assisting during digging work

 

During digging work there's a continue safety policy

 

 

       

 

 

 
 
     
    
  aDeDe
Antwerpsesteenweg 56 9000 Gent - Belgium
Tel : +32 (0)9 228.61.50
Fax : +32 (0)9 261.26.61
experts in explosives
 
     
  Landmines ?  
  Every day millions of people are confronted with anti person landmines... More >  
   
  UXO's !
  In the most European countries they still find functioning, not exploded war gears every day... More >
 
Copyright aDeDe bvba 2003 | Terms of use | Design by SoftSign Webdesign